- Execute the electric wire system
- Execute the water pipe systems which supply water and drainage water
- Install the water and electric equipment.
We install the lightning protection systems in accordance with Vietnam current regulations & standards.
Periodically earth resistance check must be required at least 1 time per year to ensure that the system also works well to ensure the safety of human and assets.